Inteco PTI received the order for a ladle Gas Coupling system from Ternium Siderar, Argentina
The system will consist of 5 double (lower) sets as well as 16 double ladle (upper) sets that will equip the entire ladle fleet in the melt shop. The order includes engineering, installation supervision and start-up.