Chemical Energy

Archive

INTECO PTI received FAC from JSW Mingo Junction for their Lime Injection System

JSW Steel USA, Ohio needed a solution to get lime in their 350T consteel furnace. The solution provided by INTECO PTI included two 6531 cuft silos, one for HiCal and one for Dolomitc lime, two 350 cuft pressure vessels, a complete air compressor system and automation package.

 

Read more …

Nucor Steel Darlington orders VD unit from INTECO

Nucor is one of the largest and most diversified steel producers of North America. Since many years INTECO PTI has been a reliable supplier for innovative steel plant components to various Nucor plants and now it is a great honour for the INTECO headquarter in Austria to deliver steel refining technology to the American steel giant.

Read more …

Nucor Darlington orders a JetBox and Burner System from INTECO PTI

Nucor Darlington, SC has ordered a Chemical Energy System for their Consteel EAF from INTECO PTI. The order includes JetBoxes and Burners as well as automation and process support during start up and commissioning.

 

 

Read more …

SSAB Mobile, AL orders Carbon Injection #2 revamp from Inteco PTI

SSAB Mobile, AL has awarded Inteco PTI with the revamp of their existing Carbon Injection pressure vessel unit #2. The entire package consists of engineering, project management, start up and on-site fabrication and commissioning of the entire pipework, controls and all electrical parts.

 

Read more …

CMC Seguin, TX orders a Swing Door

In July 2019 Inteco PTI received an order from CMC Seguin, TX for the equipment supply, start up and commissioning of a Swing Door technology package for their EAF.

 

Read more …